Planning factor / 01Aisles and pick zones
Tall shelving can block a view that looks clear on a floor plan. Mark aisle ends, cross-aisles, picking areas and intersections; consider whether the goal is to see movement through a zone or more detail at a particular work point. Verify camera height, lens, obstruction and lighting in the actual layout.
Planning factor / 02Docks, doors and yard transitions
Receiving and shipping doors combine movement, backlight and frequent changes in door position. Assess the approach, threshold and interior activity as separate views where needed. Exterior views require suitable equipment placement, weather exposure review and a dependable cable route.
Planning factor / 03Lighting changes by shift
Daylight at a dock, high-bay fixtures, dark aisle ends and overnight operation can produce very different images. Review representative conditions and whether color, motion detail or a broad overview matters most. A daytime walkthrough alone cannot confirm after-dark performance.
Planning factor / 04Recording and network capacity
Camera count is only one input to storage. Resolution, bitrate, frame rate, compression, activity, recording schedule and usable drive capacity all affect retention. Network switching and PoE capacity, cable pathways and recorder placement should be checked before promising reuse or duration.